Tier II reporting in Indiana
Who has to file in Indiana, where the report goes, when it is due, what it costs and who else gets a copy, as Indiana's own pages give it.
Source: Indiana: Emergency Planning and Community Right-to-Know · checked
- Due
- March 1, report and fee
- Filed through
- HazConnect
- State fee
- Yes
- Thresholds
- Federal
Who has to file in Indiana?
Indiana uses the federal thresholds.
A chemical is reported when the most of it on site at any one time in the year is at or over its threshold.
Source: 40 CFR 370.10(a)(2)(i) · checked
Federal thresholds
- An extremely hazardous substance
- 500 lb
-
Or the substance's threshold planning quantity, if that is lower.
Source: 40 CFR 370.10(a)(1) · checked
- Gasoline at a retail gas station
- 75,000 gallons
-
Gasoline, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other gasoline at the station is tested as a hazardous chemical.
Source: 40 CFR 370.10(a)(2)(ii) · checked
- Diesel fuel at a retail gas station
- 100,000 gallons
-
Diesel fuel, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other diesel fuel at the station is tested as a hazardous chemical.
Source: 40 CFR 370.10(a)(2)(iii) · checked
How do you file in Indiana?
Indiana takes the report through HazConnect.
- File through
- HazConnect (state-hosted) Open tier2.dhs.in.gov
- Using it is
- Required
- Before a first filing
- Register and wait for staff approval; one account per facility; no lead time stated
- Due
- March 1, report and fee
Source: Indiana: Emergency Planning and Community Right-to-Know · checked
What does Indiana charge?
Indiana charges a fee.
- Fee
- One fee per facility: $200 if 1,000,000 lb or more of any hazardous chemical was present at one time; $100 otherwise; $50 for a facility reporting only underground tanks. Government and state educational institutions exempt
- How it is paid
- Online through HazConnect, on the state payment site. No paper checks from January 1, 2027
Source: Indiana: Emergency Planning and Community Right-to-Know · checked
The schedule, line by line
| Charge | Amount | When it applies |
|---|---|---|
| Per facility | $200 per facility | 1,000,000 lb or more of any hazardous chemical present at one time |
| Per facility | $100 per facility | Above federal thresholds, under 1,000,000 lb |
| Per facility | $50 per facility | Underground storage tank facility with nothing else above threshold |
| Late charge | $20 per month | Rises $20 each month; at most 100% of the fee |
| Pays nothing | No fee | Federal and state government, state educational institutions, political subdivisions |
Source: Indiana: Tier II Reporting Fees 2025 · checked
This is the schedule as it is published. What one facility owes depends on what it reports.
Who else gets a copy?
Filing with the state also covers the copies for the local emergency planning committee and the fire department.
- Local copies
- "Submission online satisfies the requirement"; the facility must still give the information to the county committee or fire department on request
Source: Indiana: Emergency Planning and Community Right-to-Know · checked
What Indiana adds
What the state asks for beyond the federal form, and what catches filers out.
- Also asked for
- Site plan must be submitted with the annual report (5 MB maximum)
- Worth knowing
- Late fee $20, rising $20 a month, to at most 100% of the fee
Source: Indiana: Emergency Planning and Community Right-to-Know · checked
Where this comes from
Everything here was read from Indiana's own pages. Where this page and the state's differ, the state's is right.
- Last checked
- What the state's pages describe
- Undated