Tier II reporting in Ohio

Who has to file in Ohio, where the report goes, when it is due, what it costs and who else gets a copy, as Ohio's own pages give it.

Source: Ohio: SERC manual · checked

Due
March 1 for the report; fee by March 31
Filed through
Tier2 Submit file
State fee
Yes
Thresholds
Federal

Who has to file in Ohio?

Ohio uses the federal thresholds.

A chemical is reported when the most of it on site at any one time in the year is at or over its threshold.

Source: 40 CFR 370.10(a)(2)(i) · checked

Federal thresholds

An extremely hazardous substance
500 lb

Or the substance's threshold planning quantity, if that is lower.

Source: 40 CFR 370.10(a)(1) · checked

Any other hazardous chemical
10,000 lb

Source: 40 CFR 370.10(a)(2)(i) · checked

Gasoline at a retail gas station
75,000 gallons

Gasoline, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other gasoline at the station is tested as a hazardous chemical.

Source: 40 CFR 370.10(a)(2)(ii) · checked

Diesel fuel at a retail gas station
100,000 gallons

Diesel fuel, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other diesel fuel at the station is tested as a hazardous chemical.

Source: 40 CFR 370.10(a)(2)(iii) · checked

How do you file in Ohio?

Ohio takes the report as a file made with EPA's Tier2 Submit program.

File through
EPA Tier2 Submit file emailed to the state with a certification letter Email SERC@epa.ohio.gov
Using it is
Strongly encouraged
Also accepted
Flash drive; paper state or federal forms
Due
March 1 for the report; fee by March 31

Source: Ohio: SERC manual · checked

What does Ohio charge?

Ohio charges a fee.

Fee
$150 base, plus $20 per hazardous chemical, plus $150 per extremely hazardous substance; capped at $2,500 per facility. Oil and gas extraction storage: $50 flat for up to 25 facilities
How it is paid
Check or money order to Treasurer, State of Ohio, mailed with the invoice stub. No online payment mentioned

Source: Ohio: SERC manual · checked

The schedule, line by line

Per facility $150 per facility Base fee
Per chemical $20 per hazardous chemical Not charged on an extremely hazardous substance
Per extremely hazardous substance $150 per extremely hazardous substance
The most that can be owed $2,500 per facility
Flat fee $50 per filer Oil and gas extraction storage, 25 or fewer facilities; $10 per facility above 25, to $900
Late charge 10% of total fee Payment postmarked after March 31
Pays nothing No fee Agricultural producers and transportation-related facilities not required to report

Source: Ohio Administrative Code, rule 3750-50-01 · checked

Source: Ohio: SERC Filing Fee worksheet · checked

This is the schedule as it is published. What one facility owes depends on what it reports.

Who else gets a copy?

The local emergency planning committee and the fire department each get a copy from you, apart from the state filing.

Local copies
File and letter to the state and the county committee; a paper copy with the map to the fire department

Source: Ohio: SERC manual · checked

What Ohio adds

What the state asks for beyond the federal form, and what catches filers out.

Also asked for
Facility map required; certification letter; D-U-N-S; recommended file name; Ohio Facility Identification Form
Worth knowing
10% late fee on payments postmarked after March 31. New chemical: notice in 90 days (60 for an extremely hazardous substance)

Source: Ohio: SERC manual · checked

Where this comes from

Everything here was read from Ohio's own pages. Where this page and the state's differ, the state's is right.

Last checked
What the state's pages describe
Reporting year 2025