Tier II reporting in Texas
Who has to file in Texas, where the report goes, when it is due, what it costs and who else gets a copy, as Texas's own pages give it.
Source: Texas: Tier II Chemical Reporting · checked
- Due
- March 1
- Filed through
- The state's own system
- State fee
- Yes
- Thresholds
- Federal
Who has to file in Texas?
Texas uses the federal thresholds.
A chemical is reported when the most of it on site at any one time in the year is at or over its threshold.
Source: 40 CFR 370.10(a)(2)(i) · checked
Federal thresholds
- An extremely hazardous substance
- 500 lb
-
Or the substance's threshold planning quantity, if that is lower.
Source: 40 CFR 370.10(a)(1) · checked
- Gasoline at a retail gas station
- 75,000 gallons
-
Gasoline, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other gasoline at the station is tested as a hazardous chemical.
Source: 40 CFR 370.10(a)(2)(ii) · checked
- Diesel fuel at a retail gas station
- 100,000 gallons
-
Diesel fuel, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other diesel fuel at the station is tested as a hazardous chemical.
Source: 40 CFR 370.10(a)(2)(iii) · checked
How do you file in Texas?
Texas takes the report through a system of its own.
- File through
- Tier II Online Reporting System, inside STEERS Open www3.tceq.texas.gov
- Using it is
- Required
- Also accepted
- Paper and uploaded Tier2 Submit files are not offered
- Before a first filing
- STEERS account; customer, site and Tier II numbers (CN, RN, TXT2) through the Core Data application; a signed participation agreement; state approval. No lead time stated
- Filing opens
- January 1 (drafts from November 1)
- Due
- March 1
Source: Texas: Tier II Chemical Reporting · checked
What does Texas charge?
Texas charges a fee.
- Fee
- By facility type and number of chemicals. Non-manufacturing or public employer: $50 for 75 or fewer chemicals, $100 for 76 or more. Manufacturing: $100 for 25 or fewer, rising by $100 per band to $500 for 101 or more. Small facilities under one owner can be consolidated under one fee. Federal facilities exempt
- How it is paid
- Online by card or bank transfer, or a mailed invoice
Source: Texas: Tier II Chemical Reporting · checked
The schedule, line by line
| Charge | Amount | When it applies |
|---|---|---|
| By number of chemicals | $50 per facility | Non-manufacturing or public employer: 1 to 75 chemicals |
| By number of chemicals | $100 per facility | Non-manufacturing or public employer: 76 or more chemicals |
| By number of chemicals | $100 per facility | Manufacturing (NAICS 31 to 33): 1 to 25 chemicals |
| By number of chemicals | $200 per facility | Manufacturing (NAICS 31 to 33): 26 to 50 chemicals |
| By number of chemicals | $300 per facility | Manufacturing (NAICS 31 to 33): 51 to 75 chemicals |
| By number of chemicals | $400 per facility | Manufacturing (NAICS 31 to 33): 76 to 100 chemicals |
| By number of chemicals | $500 per facility | Manufacturing (NAICS 31 to 33): 101 or more chemicals |
| Pays nothing | No fee | Federal facilities |
Source: Texas: Step 5: Paying Tier II Fees · checked
This is the schedule as it is published. What one facility owes depends on what it reports.
Who else gets a copy?
The local emergency planning committee and the fire department each get a copy from you, apart from the state filing.
- Local copies
- "you are also required to submit exported copies to your local emergency planning committee (LEPC) and local fire department"; each local agency chooses the format
Source: Texas: Tier II Chemical Reporting · checked
What Texas adds
What the state asks for beyond the federal form, and what catches filers out.
- Also asked for
- Coordinates in decimal degrees to four places, longitude negative
- Worth knowing
- A submitted report cannot be recalled, and a corrected annual or initial report is charged again. New chemical: 90 days; ammonium nitrate used in fertilizer: 72 hours. The system exports a Tier2 Submit-compatible file
Source: Texas: Tier II Chemical Reporting · checked
Where this comes from
Everything here was read from Texas's own pages. Where this page and the state's differ, the state's is right.
- Read from
- Texas: Tier II Chemical Reporting
- Last checked
- What the state's pages describe
- Fee schedule dated July 2022