Tier II reporting in Wisconsin
Who has to file in Wisconsin, where the report goes, when it is due, what it costs and who else gets a copy, as Wisconsin's own pages give it.
Source: Wisconsin: Emergency Planning and Community Right-to-Know Act (EPCRA) · checked
- Due
- March 1, received by, report and fee
- Filed through
- HazConnect
- State fee
- Yes
- Thresholds
- Federal
Who has to file in Wisconsin?
Wisconsin uses the federal thresholds.
A chemical is reported when the most of it on site at any one time in the year is at or over its threshold.
Source: 40 CFR 370.10(a)(2)(i) · checked
Federal thresholds
- An extremely hazardous substance
- 500 lb
-
Or the substance's threshold planning quantity, if that is lower.
Source: 40 CFR 370.10(a)(1) · checked
- Gasoline at a retail gas station
- 75,000 gallons
-
Gasoline, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other gasoline at the station is tested as a hazardous chemical.
Source: 40 CFR 370.10(a)(2)(ii) · checked
- Diesel fuel at a retail gas station
- 100,000 gallons
-
Diesel fuel, all grades combined, at a retail gas station, in tanks that are entirely underground and that met every underground storage tank requirement throughout the preceding calendar year. A retail gas station sells gasoline or diesel principally to the public for motor vehicles on land. Any other diesel fuel at the station is tested as a hazardous chemical.
Source: 40 CFR 370.10(a)(2)(iii) · checked
From Wisconsin's pages
Coverage is wider than federal: public agencies report, and construction sites and batch plants file short-notice reports
Source: Wisconsin: Emergency Planning and Community Right-to-Know Act (EPCRA) · checked
How do you file in Wisconsin?
Wisconsin takes the report through HazConnect.
- File through
- WHOPRS, which runs on HazConnect Open wisconsin.hazconnect.com
- Using it is
- Strongly preferred
- Also accepted
- Hard copy on state forms
- Due
- March 1, received by, report and fee
Source: Wisconsin: Emergency Planning and Community Right-to-Know Act (EPCRA) · checked
What does Wisconsin charge?
Wisconsin charges a fee.
- Fee
- Per facility by number of chemicals, in eight bands from $275 (one chemical) to $1,745 (over 500), each about 20% higher at 100,000 lb or more. Employers with fewer than 10 full-time equivalents in the state exempt
- How it is paid
- Card in the system, or check with a hard copy
Source: Wisconsin: Emergency Planning and Community Right-to-Know Act (EPCRA) · checked
The schedule, line by line
| Charge | Amount | When it applies |
|---|---|---|
| By number of chemicals | $275 per facility | 1 chemical, maximum daily amount under 100,000 lb |
| By number of chemicals | $330 per facility | 1 chemical, 100,000 lb or more |
| By number of chemicals | $550 per facility | 2 to 10 chemicals, maximum daily amount under 100,000 lb |
| By number of chemicals | $655 per facility | 2 to 10 chemicals, 100,000 lb or more |
| By number of chemicals | $825 per facility | 11 to 100 chemicals, maximum daily amount under 100,000 lb |
| By number of chemicals | $990 per facility | 11 to 100 chemicals, 100,000 lb or more |
| By number of chemicals | $1,010 per facility | 101 to 200 chemicals, maximum daily amount under 100,000 lb |
| By number of chemicals | $1,210 per facility | 101 to 200 chemicals, 100,000 lb or more |
| By number of chemicals | $1,195 per facility | 201 to 300 chemicals, maximum daily amount under 100,000 lb |
| By number of chemicals | $1,430 per facility | 201 to 300 chemicals, 100,000 lb or more |
| By number of chemicals | $1,380 per facility | 301 to 400 chemicals, maximum daily amount under 100,000 lb |
| By number of chemicals | $1,650 per facility | 301 to 400 chemicals, 100,000 lb or more |
| By number of chemicals | $1,560 per facility | 401 to 500 chemicals, maximum daily amount under 100,000 lb |
| By number of chemicals | $1,870 per facility | 401 to 500 chemicals, 100,000 lb or more |
| By number of chemicals | $1,745 per facility | Over 500 chemicals, maximum daily amount under 100,000 lb |
| By number of chemicals | $2,090 per facility | Over 500 chemicals, 100,000 lb or more |
| Late charge | 20% of fee | |
| Pays nothing | No fee | Employers with fewer than 10 full-time equivalent employees in the state |
Source: Wisconsin Administrative Code, WEM 1.04 · checked
This is the schedule as it is published. What one facility owes depends on what it reports.
Who else gets a copy?
Filing with the state also covers the copies for the local emergency planning committee and the fire department.
- Local copies
- "Submitting in WHOPRS meets your reporting requirements." Not stated for a hard-copy filing
Source: Wisconsin: Emergency Planning and Community Right-to-Know Act (EPCRA) · checked
What Wisconsin adds
What the state asks for beyond the federal form, and what catches filers out.
- Also asked for
- Site plan required by rule; statewide employee count
- Worth knowing
- Late surcharge 20%. Separate one-time $1,080 planning fee for section 302 facilities
Source: Wisconsin: Emergency Planning and Community Right-to-Know Act (EPCRA) · checked
Where this comes from
Everything here was read from Wisconsin's own pages. Where this page and the state's differ, the state's is right.
- Last checked
- What the state's pages describe
- Fees effective 2025